Forum Help - Search - Members - Calendar
Full Version: B'ville Rock Switching Question
3DTrains Forums > Simulation Discussion > Strategic Partners > V Scale Creations
davidspooner
I've just had a go at the Berryville rock switcher 1 activity..... The work order states to take the loaded cars from the quarry 2 to B'ville yard 1 and from the quarry 1 to B'ville trk1.... I assumed this was Old Yard Track 1 as i can't seem to find a b'ville trk 1 anywhere but when i got to the old yard there was a line of grain cars in track 1...... Where should the loaded hoppers be dropped off??? Old Yard track 2?

Cheers

David.
laming
I may not have typed the exact name required into the Work Order. Sorry for the confusion.

Anytime a "yard track" is referred to in Berryville that does NOT contain the words "Old Yard"... then it is the new yard down by the depot.

Andre
TrueNorth
If I remember it doesn't matter where you leave them I left one set on Bville Yard 1 & the other set on the thru track. At some point before switching the empties to Ozark Limestone 1 & 2, you'll get a pop up...

[Edited to keep top secrets secret. Andre Ming laugh.gif ]

Rich...
davidspooner
Thanks for the reply Andre but i'm still a little confused.......

The two consists at the quary were to be dropped off at B'ville yard 1.... Which is the new yard track 1..... But the other consist (in quary track 1 i think) was to be taked to "Berryville Track 1".... It didn't say yard or old yard just b'ville track 1.... I couldn't find a b'ville track 1 so i assumed it was b'ville old yard track 1 but when i got there it was filled with grain hoppers.

Cheers

David.
This is a "lo-fi" version of our main content. To view the full version with more information, formatting and images, please click here.
Invision Power Board © 2001-2012 Invision Power Services, Inc.