|
Hi All:
I could use a couple of you that would be willing to check the track work on this personal quest I'm on: The Frisco Lines.
Frankly, it has grown so fast that I have not taken the time to thoroughly check the track work by running trains hither and yon.
Before you decide to contact me:
* This is a RAW route. That is, no scenic elements. 99% of the terrain has not be molded to fit the track. It is a route in its most basic state.
* I would need you to run trains up/down the mainlines, and even light engines over ALL existing yard and industry tracks.
* With the lat/long window active during your runs, note any rough joints, abrupt elevation changes, etc, and email me a description of the issue as well as the coordinates.
This is actual beta WORK and not a way to have advance play time with a route that is nearing completion. If interested, contact via my email at:
laming at cebridge dot net
Or, use the PM feature here at the forums.
Given the size of the route, I will need to burn a CD and get it to you via snail mail.
Thanks!
|